top of page

Week 5

February 05, 2018

this week we watched the darkest hour, more attracte me than last film. starting to make the A3 sized sign, laser cut and Ai used, made by acylic sheet.  

Week 4

January 29, 2018

On Tuesday we went to the HMV to see the flim "Downsizing", which is about Unit 4 project. On Friday, our group booked the green screen studio for fliming.

Week 3

January 22, 2018

I still research on the sign I going to make, because I am not really satisfied with the sign I making now. Which is a standard guide card and it says "Enter here for expedited screening". In addition, it shows the location, country and the symbol of the police, on the bottom.

On Friday, I went to the editing lesson, it shows how to put the objects together. 

Week 2

January 15, 2018

I went to the workshop, and demonstrate the sign making by the plastic sheet. It recorded lots of good detail, then we painted on the sign. I also went to the wood workshop in this week, and the teacher helped me thinking the signs making, and the materials I could use in a cheaper way. I also went to the green screen workshop, they are talked about how to use the camera to film, such as ISO, white balance and focal length etc.

Week 1

January 08, 2018

This is my first week back from holiday and started to make the colour model. The first thing I made that was the baggage scanner. In addition, the black track was made by tissue paper. Moreover, one thing that I regret the track is not moveable. Also, bought some silver colour but it is hard to paint it really smoothly. Then searched some information on the camera, such as size and colour. In fact, the CCTV camera is much smaller than I thought, so I used the small tweezer to make it, this tool could help me making the small details easier.

​

Please reload

bottom of page